Socata TBM 900 vs Epic E1000

The Epic E1000 and Daher TBM are the two fastest single-engine turboprops — both ~330 kt PT6-powered pressurised singles, the E1000 all-carbon, the TBM the established market leader.

Full Specs Comparison

Swipe to see all specs
Spec / Model Socata TBM 900 Epic E1000
Socata TBM 900
View 14 listings →
Median $2,970,000
Epic E1000
View 10 listings →
Median $3,849,000
Price Range $2,700,000 – $3,050,000 $3,750,000 – $4,700,000
Category Single Engine Turboprop Single Engine Turboprop
Model Specifications
Seats 1
Cruise Speed 6 kts (11 km/h)
Fuel Burn 40.0 GPH (151 L/h)
TBO 3,600 hrs
Overhaul Cost $350,000
Annual Fixed $80,000
Hourly Variable $600
Engines 1 x Turboprop

Cost of Ownership

Estimate

Socata TBM 900

Epic E1000

Fuel$220/hr
Variable$600/hr
Annual Fixed$80,000/yr
Total (200 hrs/yr) $200,000/yr

Which Should You Buy: Socata TBM 900 or Epic E1000?

Bottom line: Choose the TBM for the proven fleet, support network and resale; choose the Epic E1000 for comparable speed with a roomier carbon cabin, often at lower acquisition cost. TBM = proven/support; E1000 = cabin/value.

Pick the TBM 900 if…

  • Budget matters — from $2,700,000 vs $3,750,000, you save ~$1,050,000.
  • More inventory — 14 listings vs 10.

Pick the E1000 if…

Auto-generated from current market data and published specs. Confirm with a pre-buy inspection and professional appraisal.

Frequently Asked Questions

Which is better, Socata TBM 900 or Epic E1000?
It depends on your mission and budget. The E1000 cruises at 6 kts. Review the specs table above to find which fits your flying profile.
How do prices compare?
Socata TBM 900: from $2,990,000. Epic E1000: from $3,849,000. Prices vary by year, hours, avionics, and condition. Always get a pre-buy inspection.
What's the difference between Socata TBM 900 and Epic E1000?
Which is cheaper to operate per hour?
E1000: about $600/hr variable cost. Variable cost includes fuel, reserves and overhaul accruals. Annual fixed costs (hangar, insurance, annual inspection) add to the total.
Which has more seats and useful load?
E1000: 1 seats. Useful load = max gross weight minus empty weight; it determines how much fuel plus payload you can carry.
How does maintenance compare — TBO and overhaul cost?
E1000: 3,600-hour TBO, overhaul ~$350,000. Reaching the time-between-overhaul (TBO) triggers a mandatory engine/airframe rebuild that affects resale value.
Disclaimer: All prices and cost estimates are from third-party sources for informational purposes only. Always obtain professional appraisal and inspection before purchase.
Prices updated daily · Data: FAA Registry, NTSB · About our data