Cessna Citation I vs Eclipse EA500

Live Market Snapshot

Current asking-price market, aggregated across multiple marketplaces · re-checked on a rolling daily cycle

Cessna Citation I
For sale now
35
Median asking
$720,000
Range
$334,239–$1,125,596
Model years available
1972–2014
Eclipse EA500

No active listings right now.

Live data from AeroGurus, aggregated daily across the used-aircraft market. Figures are current asking prices, not appraisals — confirm with a pre-buy inspection.

Full Specs Comparison

Swipe to see all specs
Spec / Model Cessna Citation I Eclipse EA500
Cessna Citation I
View 35 listings →
Median $720,000
Eclipse EA500
View 1 listings →
Median $1,375,000
Price Range $334,239 – $1,125,596 $1,375,000
Category Very Light Jet Very Light Jet
Model Specifications
Seats 7
Cruise Speed 350 kts (648 km/h)
Range 1,500 nm (2,778 km)
Service Ceiling 41,000 ft (12,497 m)
Max Gross Weight 11,850 lbs (5,375 kg)
Useful Load 3,000 lbs (1,361 kg)
Fuel Capacity 229.0 gal (867 L)
Fuel Burn 110.0 GPH (416 L/h)
TBO 3,500 hrs
Overhaul Cost $200,000
Annual Fixed $180,000
Hourly Variable $1,400
Engines 2 x Turbofan

Cost of Ownership

Estimate

Cessna Citation I

Fuel$605/hr
Variable$1,400/hr
Annual Fixed$180,000/yr
Total (200 hrs/yr) $460,000/yr

Eclipse EA500

Frequently Asked Questions

Which is better, Cessna Citation I or Eclipse EA500?
It depends on your mission and budget. The Citation I cruises at 350 kts with 1,500 nm range. Review the specs table above to find which fits your flying profile.
How do prices compare?
Cessna Citation I: from $720,000. Eclipse EA500: from $1,375,000. Prices vary by year, hours, avionics, and condition. Always get a pre-buy inspection.
What's the difference between Cessna Citation I and Eclipse EA500?
Citation I engine: PRATT & WHITNEY JT15D-1A.
Which is cheaper to operate per hour?
Citation I: about $1400/hr variable cost. Variable cost includes fuel, reserves and overhaul accruals. Annual fixed costs (hangar, insurance, annual inspection) add to the total.
Which has more seats and useful load?
Citation I: 7 seats / 3,000 lb useful load. Useful load = max gross weight minus empty weight; it determines how much fuel plus payload you can carry.
How does maintenance compare — TBO and overhaul cost?
Citation I: 3,500-hour TBO, overhaul ~$200,000. Reaching the time-between-overhaul (TBO) triggers a mandatory engine/airframe rebuild that affects resale value.
Disclaimer: All prices and cost estimates are from third-party sources for informational purposes only. Always obtain professional appraisal and inspection before purchase.
Prices re-checked on a rolling cycle — most within a few days · Data: FAA Registry, NTSB · About our data