Mooney M20E vs Piper Arrow
Full Specs Comparison
Swipe to see all specs
| Spec / Model | Mooney M20E | Piper Arrow |
|---|---|---|
|
|
|
| Price Range | $60,000 – $190,000 | $44,950 – $429,460 |
| Category | Single Engine Piston | Single Engine Piston |
| Model Specifications | ||
| Seats | 4 | 4 |
| Horsepower | — | 200 HP |
| Cruise Speed | — | 135 kts (250 km/h) |
| Range | — | 720 nm (1,333 km) |
| Service Ceiling | — | 15,400 ft (4,694 m) |
| Max Gross Weight | 12,500 lbs (5,670 kg) | 2,750 lbs (1,247 kg) |
| Useful Load | — | 940 lbs (426 kg) |
| Fuel Capacity | — | 72.0 gal (273 L) |
| Fuel Burn | 10.0 GPH (38 L/h) | 10.5 GPH (40 L/h) |
| TBO | 2,000 hrs | 2,000 hrs |
| Overhaul Cost | $25,000 | $30,000 |
| Annual Fixed | $15,000 | $18,000 |
| Hourly Variable | $110 | $145 |
| Engines | 1 x Reciprocating | 1 x Piston |
Cost of Ownership
EstimateMooney M20E
Fuel$55/hr
Variable$110/hr
Annual Fixed$15,000/yr
Total (200 hrs/yr)
$37,000/yr
Piper Arrow
Fuel$58/hr
Variable$145/hr
Annual Fixed$18,000/yr
Total (200 hrs/yr)
$47,000/yr
Which Should You Buy: Mooney M20E or Piper Arrow?
Pick the M20E if…
- Lower operating cost — ~$110/hr vs $145/hr.
Pick the Arrow if…
- Budget matters — from $44,950 vs $60,000, you save ~$15,050.
- Newer design — production from 1967 vs 1965.
- More inventory — 195 listings vs 28.
Auto-generated from current market data and published specs. Confirm with a pre-buy inspection and professional appraisal.
Frequently Asked Questions
Which is better, Mooney M20E or Piper Arrow?
It depends on your mission and budget.
The Arrow cruises at 135 kts with 720 nm range.
Review the specs table above to find which fits your flying profile.
How do prices compare?
Piper Arrow: from $79,000.
Prices vary by year, hours, avionics, and condition. Always get a pre-buy inspection.
What's the difference between Mooney M20E and Piper Arrow?
M20E engine: Lycoming O-360.
Which is cheaper to operate per hour?
M20E: about $110/hr variable cost.
Arrow: about $145/hr variable cost.
Variable cost includes fuel, reserves and overhaul accruals. Annual fixed costs (hangar, insurance, annual inspection) add to the total.
Which has more seats and useful load?
M20E: 4 seats.
Arrow: 4 seats / 940 lb useful load.
Useful load = max gross weight minus empty weight; it determines how much fuel plus payload you can carry.
How does maintenance compare — TBO and overhaul cost?
M20E: 2,000-hour TBO, overhaul ~$25,000.
Arrow: 2,000-hour TBO, overhaul ~$30,000.
Reaching the time-between-overhaul (TBO) triggers a mandatory engine/airframe rebuild that affects resale value.
Disclaimer: All prices and cost estimates are from third-party sources for informational purposes only. Always obtain professional appraisal and inspection before purchase.
Prices updated daily · Data: FAA Registry, NTSB · About our data