Daher TBM 940 vs Cirrus Vision SF50
Full Specs Comparison
Swipe to see all specs
| Spec / Model | Daher TBM 940 | Cirrus Vision SF50 |
|---|---|---|
|
|
|
| Price Range | $3,895,000 – $4,300,000 | $470,000 – $3,650,000 |
| Category | Single Engine Turboprop | Very Light Jet |
| Model Specifications | ||
| Seats | — | 7 |
| Cruise Speed | — | 311 kts (576 km/h) |
| Range | — | 1,200 nm (2,222 km) |
| Service Ceiling | — | 31,000 ft (9,449 m) |
| Max Gross Weight | — | 6,040 lbs (2,740 kg) |
| Useful Load | — | 2,180 lbs (989 kg) |
| Fuel Capacity | — | 296.0 gal (1120 L) |
| Fuel Burn | — | 50.0 GPH (189 L/h) |
| TBO | — | 4,000 hrs |
| Overhaul Cost | — | $250,000 |
| Annual Fixed | — | $200,000 |
| Hourly Variable | — | $950 |
| Engines | — | 1 x Turbofan |
Cost of Ownership
EstimateDaher TBM 940
Cirrus Vision SF50
Fuel$275/hr
Variable$950/hr
Annual Fixed$200,000/yr
Total (200 hrs/yr)
$390,000/yr
Which Should You Buy: Daher TBM 940 or Cirrus Vision SF50?
Pick the TBM 940 if…
Pick the Vision SF50 if…
- Budget matters — from $470,000 vs $3,895,000, you save ~$3,425,000.
- More inventory — 48 listings vs 4.
Auto-generated from current market data and published specs. Confirm with a pre-buy inspection and professional appraisal.
Frequently Asked Questions
Which is better, Daher TBM 940 or Cirrus Vision SF50?
It depends on your mission and budget.
The Vision SF50 cruises at 311 kts with 1,200 nm range.
Review the specs table above to find which fits your flying profile.
How do prices compare?
Daher TBM 940: from $4,250,000.
Cirrus Vision SF50: from $2,599,000.
Prices vary by year, hours, avionics, and condition. Always get a pre-buy inspection.
What's the difference between Daher TBM 940 and Cirrus Vision SF50?
Which is cheaper to operate per hour?
Vision SF50: about $950/hr variable cost.
Variable cost includes fuel, reserves and overhaul accruals. Annual fixed costs (hangar, insurance, annual inspection) add to the total.
Which has more seats and useful load?
Vision SF50: 7 seats / 2,180 lb useful load.
Useful load = max gross weight minus empty weight; it determines how much fuel plus payload you can carry.
How does maintenance compare — TBO and overhaul cost?
Vision SF50: 4,000-hour TBO, overhaul ~$250,000.
Reaching the time-between-overhaul (TBO) triggers a mandatory engine/airframe rebuild that affects resale value.
Disclaimer: All prices and cost estimates are from third-party sources for informational purposes only. Always obtain professional appraisal and inspection before purchase.
Prices updated daily · Data: FAA Registry, NTSB · About our data